Federal pacific panels also known as fpe panels were a popular residential electrical panel choice in the mid to late 20th century.
Federal pacific electrical panel replacement cost.
Electrical panel replacement typically takes 8 to 10 hours which includes 200 amp capability a new panel with main breaker and ten circuit breakers labor and all required materials.
They have design flaws that could cause a house fire.
Option 2 federal pacific electric panel removal and replacement with a new brand x electrical panel is likely to cost twice as much as option 1 with the ch replacement load center and electrical panel enclosure adapter.
This document discusses the typical costs to replace an electrical panel.
This information on electrical panel replacement costs suipports our articles describing hazards leading to the need to replace federal pacific stab lok electric panels or zinsco zinsco sylvania electric panels in buildings.
Since these are older systems this includes some upgrades to wiring.
They were one of the most popular brands on the market at that time and were installed in millions of homes and businesses.
The cost to replace a federal pacific or zinsco panel ranges from 1 500 to 4 000.
Federal pacific stab lok panels are a brand of electrical circuit breaker panels that were manufactured and installed from the 1950s through the 1980s.
With an electrician s hourly rates at 40 to 100 hour and with the first hour costing 75 to 120 you can expect to spend between 400 and 800 for labor costs.
If you have one you ll want to call a pro as soon as possible to upgrade.
The panel was well known in the building community as a cheaper alternative to some of the more recognizable panel companies such as general electric i t e and square d.
However the replacement of the panel often is accompanied by other repairs to meet current electrical codes.
A federal pacific electrical panel as well as other brands and derivatives of fpe breakers are supposed to function as follows.
The biggest cost for most electrical work is labor.
Cost to replace or install an electrical panel.
Option 2 can be expected to require at least twice the labor of option 1.